Asbestos removal options
Asbestos popcorn ceiling removal
If you plan a skylight, new lights or a smoother ceiling, we sample the texture first. We take separate samples of the paint, the patches and any later repairs inside the area your work will reach, since the look of a ceiling says nothing about what is in it. The results show which ceilings come down. We seal off those rooms before the scraping starts. Patching and paint come afterwards as a separate job unless we agree otherwise.
Asbestos floor tile and mastic removal
A floor that looks like plain vinyl can still hold asbestos in the tile, the backing or the glue. Name the rooms that are changing and any overlays or patching the floor has had before. We sample every layer the new floor will touch and lift only the positive ones. Before we start, you and we decide who repairs and preps the subfloor. Nobody should grind or sand until the glue has been tested.
Asbestos insulation removal
We take insulation on pipes, on a boiler and loose in an attic one job at a time. Do not touch any of it until it has been tested. A straight pipe run and its elbows can turn out to be different materials, so before work we mark the points where we start and stop, the heating system the insulation belongs to and the parts that stay in place. We also go over access and shutdowns with you, and with any trade replacing the pipework, before we book a date.
Asbestos siding and roofing removal
Whether it is siding or roofing, we sample cement products before a new opening is cut and before any old material comes off, since their look will not tell you what is in them. We go over the walls involved and any layers hidden underneath, and we look at whether windows, trim, a garage or an outbuilding move the point where removal stops. We plan the work around the new siding or roof, including what will cover the wall once it is bare.
Asbestos abatement before renovation and demolition
For a teardown we survey the whole building; for a remodel, every surface, opening and layer the work will reach, even if most finishes stay. Send us the plans before demolition starts. Once we have them, we do the testing, send in any notice that is needed and take out the positive materials in sequence, and your builder hears from us when their crew can move in. Anything the work will not disturb stays where it is.
Commercial asbestos abatement
A Duvall shop, office or apartment building often stays partly in use while work goes on around it. Please send the full drawings, not only the lease outline. From them we find which suites, corridors, shared air systems and delivery routes are affected, and we plan the survey and removal around the people who stay. At the end of the job, we give the owner, the tenants and the trades that follow the records each of them will need.
Addresses, outbuildings and phased work
Some addresses near Duvall sit inside the city and others out in the county, so give us the full street address when you call. We plan each job from the conditions we find at your own property.
If the job includes an outbuilding, an addition or a long access route, say so on the first call. Tell us which structures stay and which materials the work will disturb. For phased work we test each phase separately, so an area we cleared in one building does not count as cleared for another building or for a part of the property nobody has tested.
What to tell us before we visit
Surfaces, layers and outbuildings
Start with what the work will do rather than which room it is in. We need the surfaces being cut or removed, the layers you expect to find underneath and any buildings besides the house. Old reports are welcome; we read them against this job. Testing one material in one room tells us nothing about the rest of the property, so call us if the design changes before the crew gets to that part.
Who does what
Before we pick a date, we sort out three things with you: the materials coming out, where the work area stops and where it meets lived-in rooms or other trades. We explain how we get in and what is off limits during the work. You also know in advance who files any notice, who deals with the waste and who handles repairs afterwards, which matters most when several contractors work under separate contracts.
When we are done
Keep the papers from this job with your house records; a later remodel can start from them instead of from memory. At the end we hand you the records and tell you when the next trade can begin, and we point out any material still in the building so the next contractor knows to leave it alone. Disposal paperwork, a visual check and any clearance test are three different things.
Survey and project requirements in Washington
A remodel has one set of Puget Sound Clean Air Agency guidance and a teardown has another. For your Duvall property, we start with the survey, then deal with any notice and the disposal as part of the job.